the whole development plan.


                 The Lantau Development means much more than just another source
                 of developable land supply. It embodies the last – and the next – bold,
                 essential and visionary land development project of Hong Kong that
                 would be critical for our long-term social and economic development.

              6. Speeding Up Land Development


              Increasing development density

                     In view of the chronic shortage of space, to maximise the supply of
              different types of properties, we suggest further relaxation of development
              density should be considered in future NDAs or new town development
              projects, e.g. Kai Tak and Tseung Kwan O.

                     According to a recent research published by the Faculty of
              Construction and Environment of the Hong Kong Polytechnic University,
              the expected additional impacts on such factors as day-light duration, air
              circulation, skyline and atmospheric temperature are only minimal even if
              the average domestic plot ratio of the sites in Kai Tak NDA were raised to
              6.7. Such a proposed change, however, would potentially increase domestic
              and non-domestic GFA by some additional 1.6 million sf and 1.2 million sf
              respectively.


                     It should be reminded that in the 2001 development plan for the
              Kai Tak NDA, the original population intake exceeded 210,000. This is in
              stark contrast with the latest corresponding figure of 123,000. As a rough
              reference, even if the development density is further increased by 20%, the
              population intake would still be below 150,000, or 30% less than that in the
              2001 development plan.

                     Similar situation exists in other areas. Take Tsueng Kwan O South
              as another example. In 2005 when the property market was much less
              heated and the issue of over-supply was constantly lingering in the
              community, the government has responded by significantly lowering the
              plot ratios in Tseung Kwan O South from 6.5 to the range between 2 and 5.
              This represented a reduction in population intake from 131,000 to 98,000, or
              roughly 10,000 residential units.

              Optimising underused government sites


                     Our brief research on Government, Institution / Community (GIC)
              sites in the Kowloon urban areas shows there are certain GIC sites in these
              regions that are either underused or poorly managed with undesirable
              conditions. Such sites include cooked food hawker bazaars, refuse collection
              points, car parks and work sites and could be found in areas like Tsuen Wan,
              Cheung Sha Wan and Yau Ma Tei.


                     To fully realise their development potential, especially when they
              are located in the urban areas, one possible way is to redevelop these
              sites into composite buildings to accommodate the original use (e.g. the
              cooked food facilities) with other public uses atop (e.g. non-permanent

        66